The major task in 1994 is the assembling of the whole detector.
The mechanical stand is being fabricated in Tbilisi while the active target,
wire chambers and plastic veto counters will be completed by other
collaborators in the summer of 1994. Light response uniformity of the
remaining CsI crystals will be calibrated in a cosmic muon tomography setup
upon delivery. For the summer of 1994 we plan a precise calibration of the
low-energy tail of the CsI calorimeter response to 70 MeV
's and
positrons. The first operation of the whole detector is expected in 1995.